Let start with an example. The prime mover for a medium size generator set, in this example 500 KW electrical output, would be powered by an engine of about 15 liter displacement. The starter motor of an engine this size draws roughly 650 amps during the crank cycle. If the crank lasts ¼ of a second, which is typical, the total battery capacity consumed for this crank, in ampere-hours, is (650 x 0.25)/3600, or 0.045 ampere hours. This is less than 1/20th of an ampere hour.
Yet, chargers for this size of generator are frequently rated six to ten amps. Why, when each crank consumes such little battery capacity, are relatively high ampere chargers employed?
NFPA 110, the Standard for Emergency and Standby Power Systems, paragraph 5.6.4.7 (2) states that, “The charger shall be capable of returning the fully discharged battery to 100 percent of its ampere-hour rating within the time specified in Table 5.6.4.2, item.” (Bold font emphasis is added.)
In practice this means that in applications that must comply with NFPA 110 the actual cranking duty cycle is immaterial. NFPA requires that the charger be capable of bringing a fully discharged cranking battery back to full charge within either 24 hours (NFPA Level 1 installations), or 36 hours (NFPA Level 2 installations). The charger ampere output rating therefore must be computed based on the battery’s capacity, and not on the actual capacity that needs to be returned to the battery after a given crank cycle.
Only Ni-Cd starting batteries are rated in ampere-hours. To size the charger, start with the battery’s ampere-hour rating if this is available. Divide the battery’s ampere-hour capacity by the number of hours allowed to recharge. Add some charger capacity to offset inefficiencies in recharging. Also add additional charger capacity when fixed DC loads are present. The following formula may be used:
((AH x K)/T) + L = I where
AH is the ampere-hour capacity of the battery
K is the battery recharge inefficiency constant (1.15 for lead-acid and 1.4 for Ni-Cd)
T is the desired recharge time
L is the number of amperes consumed by the fixed load
I is the ampere rating of the battery charger
Using a Ni-Cd battery maker’s sizing software we find that a 15 liter engine requires a Ni-Cd battery rated 45 AH to crank a 15 liter engine for the NFPA mandated minimum cranking time of 45 total seconds. We assume NFPA Level 1 recharge performance of 24 hours is required. We further assume a hypothetical continuous DC load of 0.8 amps. The charger ampere capacity required for this instance is computed as follows:
((45 x 1.4)/24) + 0.8 = 3.425 amps
The minimum charger size required for this application is 3.425 amps. Since chargers are not available in this exact ampere output rating we would choose the next larger ampere rating, which is probably 6 amps.
Lead- acid SLI (Starting Lighting and Ignition) batteries are not typically rated in ampere-hours, meaning that the ampere-hour method to size the charger cannot be used.
SLI batteries are typically rated in Cranking Amps (CA) or Cold Cranking Amps (CCA). Conservative sizing guidance based on CCA rating of typical cranking batteries is shown in the tables below:
The following assumptions relate to the tables.
Recommended Charger Ampere Rating vs. Battery CCA
– AGM lead-acid batteries –
Group | CCA | Charger Amps |
---|---|---|
U1 | 200 | 1.6 |
22NF | 350 | 2.9 |
24 | 525 | 4.3 |
27 | 580 | 4.7 |
31M | 800 | 6.5 |
4D | 1110 | 9.1 |
8D | 1450 | 11.9 |
Recommended Charger Ampere Rating vs. Battery CCA
– Flooded lead-acid batteries –
Group | CCA | Charger Amps |
---|---|---|
3ET | 500 | 3.3 |
4D | 1050 | 6.9 |
4DLT | 850 | 5.6 |
8D | 1425 | 9.3 |
8D | 1400 | 9.2 |
8D | 1100 | 7.2 |
17TF | 530 | 3.5 |
28 | 550 | 3.6 |
30H | 650 | 4.3 |
31 | 1000 | 6.5 |
31 | 950 | 6.2 |
31 | 760 | 5.0 |
31 | 650 | 4.3 |
31 | 730 | 4.8 |
31 | 700 | 4.6 |
For larger 12V starting systems, two 12V lead-acid battery blocks may be connected in parallel. When batteries are connected in parallel, you must scale the charger amps by the number of blocks. For example, two 4D flooded battery blocks (1050 CCA each) connected in parallel would require a 12V charger rated at for at least 13.8 amps. This would likely be a 15 or 20 amp rated charger.
For 24V starting systems, two 12V battery blocks will be connected in series. Connecting batteries in series increases the voltage, but not the CCA. Using the same 4D battery blocks described above connected in series would require a 24V charger delivering at least 6.9 amps.
Very large systems may have multiple battery blocks connected in series and parallel. Using six 8D 12V battery blocks (1400 CCA each), there would be three parallel strings of two blocks connect in series. Two blocks connected in series requires a 24V charger. Three strings at 1400 CCA each is 4200 CCA total. This requires a 24V charger rated 9.2 amps x 3 = 27.6 amps. A 30 or 35 amp charger is the recommend solution.
Download PDF version of this document HERE.
The sequel to this paper will cover sizing chargers for switchgear applications